PROJECT DESCRIPTION

Project Cost: $13,200,000
Project Size: 32,400 SF

The design/build project delivery method was used to complete the new Troop Medical and Dental Clinic project. designed using evidence design principles and resulted in a welcoming environment that comforted troops seeking medical treatment. The clinic design provides soldiers with a state-of-the-art facility that contains a primary care clinic, dental clinic, physical therapy area, behavioral health area and pharmacy. These departments are positioned around a shared, centrally located waiting area with large storefront areas and overhead clerestory windows that provides a bright, uplifting environment where patients can comfortably await treatment. Multiple sustainable design features were incorporated into the project to achieve LEED Silver Certification including the installation low-flow plumbing fixtures and high-efficiency fluorescent light fixtures, HVAC enthalpy recovery wheels, and variable volume pumps on chilled water and heating hot water systems.

Troop Medical and Dental Clinic Ft Benning, Georgia
Work performed while employed at HSMM/AECOM